Project Description
Tidewater Crossing is an approximately 900+/- acre multi-phase industrial development project adjacent to the Stockton Metropolitan Airport in Stockton, CA. VVH was responsible for all civil engineering design to enhance the existing Airport Way and French Camp Road arterial corridors with additional travel lanes, pedestrian safety improvements, and traffic signal improvements. VVH designed grading improvements to maintain existing pavement structural sections to the extent achievable and provided several alternatives to full depth AC/AB pavement including full depth reclamation with cement (FDR-C), lime/cement treated subgrade, and grind and overlay with geosynthetic pavement reinforcing.
The services provided by VVH Consulting Engineers included:
- San Joaquin Council of Governments Coordination
- Lot Line Adjustment
- Boundary and Topographic Surveys
- Central Valley Flood Protection Board Permit Coordination
- United States Army Corps of Engineers Section 404/408 Permit Coordination
- California Department of Fish and Game Permit Coordination
- Plans, Specifications, and Estimates (PS&E)
- Civil Engineering and Design
- Storm Water Studies and Design
- Sanitary Sewer Studies and Design
- Bidding Support
- Project Management